– Small Shower room (approx 80x110cm) Complete partially tiled job. 6 of 12 pieces already cut. 3 mega slabs need to be scored and snapped to complete the last 6 cuts. 1 remaining tile will require drilling and hole making to fit shower therm. valve, 2 volume controls and hand shower. Floor tiling complete with correct drainage but needs epoxy grouting. -Small Toilet room: all tiling complete but needs grouting with epoxy grout. – Approx. X20 6mm holes to be drilled for bathroom furniture. – Epoxy grout rooms (same tub) after all tiling complete. Needs experience with epoxy grout as dedicated cleanup req. – All materials supplied. 4 jobs to follow in New Year. Owner/Labourer to assist.
Easily hire and pay trusted trades people with Grafter.